Below is a short summary of the video (coming soon).
You can buy all the connectors, balls, tools and trays you need in our shop.
-
You need specific USM tools . You can also find this in our shop - buy tools here .
-
Start by lightly screwing four of the eight connectors onto the balls . Buy connectors here .
-
Then place the four 350 mm tubes vertically onto these four connectors. Buy pipes here .
-
Use a ratchet with an extension attachment to tighten the connectors through the 350 tubing.
-
Next, assemble the preassembled frame with the remaining four connectors. Screw them back on loosely. You don't need to screw the connectors on extremely tightly, just a little is enough.
-
Carefully place the frame on the four vertically mounted tubes.
-
Change the ratchet attachment to tighten the frame. Note that this time you have to turn in the opposite direction - i.e. to the left.
-
Now insert the four sheets/trays.
-
When inserting the sheets/trays, make sure to start with a corner.
-
Start at the back and then press the sheet/shelf into place at the front and top.
-
Once all four sheets/trays are in place, attach the top sheet/tray with screws.